Customization: | Available |
---|---|
Flocking Process: | Box Flocking |
Control Method: | Manual |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
F03 Electrostatic flocking system:
An electrostatic flocking system having a supply hopper for controllably entraining flock fibers within a propelling air stream, and for feeding the entrained fibers to an electrostatic flocking gun. The fibers and propelling air pass through the gun and into a nozzle at the front of the gun having an elongated forwardly open chamber. An elongated electrode is carried within the nozzle chamber and is coupled to a suitable electric power source for electrostatically charging the fibers and for directing them forwardly over the entire length of the chamber toward the surface of an article being coated.
value
|
|
Type
|
Coating Production Line
|
Substrate
|
Glass
|
Condition
|
New
|
Machine Type
|
FLOCK COATING UNIT
|
Machinery Test Report
|
Provided
|
Marketing Type
|
Hot Product 2019
|
Warranty of core components
|
1 Year
|
Core Components
|
PCB, CASCADE
|
Coating
|
Painting
|
Place of Origin
|
China
|
|
Jiangsu
|
Brand Name
|
xintu
|
Voltage
|
110V/220V
|
Dimension(L*W*H)
|
49X47X59cm
|
Warranty
|
1 Year
|
Key Selling Points
|
Competitive Price
|
Applicable Industries
|
Manufacturing Plant, Construction works , Other
|
Weight (KG)
|
41
|
Machine Type
|
Spray Booths, Painting Equipment, Coating Equipment, Other
|
Input voltage
|
110V/220V, 50HZ
|
Output voltage
|
Max.100KV
|
Suitable fiber length
|
≤3MM
|
Output currency
|
100uA
|
Capacity of the flock hopper
|
about 30L
|
Flocking area
|
none limited
|
Input air pressure
|
0.2-0.5MP
|
Packing &Shipping
Shipping method: By air courier, air cargo or By sea
If ship by air courier, we can send the goods within 2 days after you finish the payment.And It will take 4-5 working days to your hand.